Westside Trail Segment 6
Lawton Street SW to Ralph David Abernathy Boulevard and White Street
Map: AREN · Official Beltline dataDetails
West Atlanta · Design · Source status as of October 9, 2026
What the project includes
The permanent path will connect the Westside Trail at Lawton Street SW with the trail at Ralph David Abernathy Boulevard near White Street.
The interim route uses ramps and an adjacent sidewalk. The new route will bring this connection back into the rail corridor.
Project guidelines and approvals
The published design calls for a 14-foot concrete shared-use path with softer shoulders on both sides. Plans also include guardrails, lighting, security cameras and stormwater controls that emphasize green infrastructure.
What the source reported
A sidewalk connection was open while the permanent rail-corridor alignment was in design.
Milestone record
- Latest recorded source date
- October 9, 2026
- Reported stage
- Design
- Next item to verify
- Look for the construction bid and a confirmed mobilization date.
This is a dated source snapshot. The next item is a research checkpoint, not a promised completion date. Check the official update below before relying on a schedule.
What to watch next
Look for the construction bid and a confirmed mobilization date.
Browse tracked projects · Send a project tip or ask a reader question · Join the Atlanta Edit list